Bulk Earthmoving Dolwen
Project: Bulk earthmoving for a caravan park development.
Location: Dolwen, Ceredigion, Wales
We were asked by a Caravan park owner at Dolwen to assist in the Bulk earthmoving on his latest caravan park development.
The objective was to carry out a cut and fill operation to create a level area for the new park development. The owner would then take over, using his own machinery to complete the project.
We worked over a weekend on this project and completed within 3 days to fit in with the owners schedule. The land was rotorvated to remove any turf and we then stripped the topsoil and stored for later in the project, we then started to cut in to the bank and fill in layers, compacting as we went.
Once we reached the desired level we levelled and graded the site and trimmed the batter. We then covered the site with as dug stone quarried on site and handed the site over to the owner.
Plant used on this project.
D5 Dozer
14T Excavator
Project Gallery